SHPP Sućeska RS-1

Building start: 

Commissioning:

August 2008

November 2009

Location: Village Strgačina, Municipality Rudo
River: Sućeska
Investor: ERS d.o.o. male hidroelektrane
Genera data:

Installed flow, Qinst.: 1,400 m³/s
Pipeline diameter: DN 800 mm / DN 900 mm
Length of the pipeline: 2.000 m / 2.060 m
Turbines: 2 Pelton turbines


Installed capacity: 1.815 kW
Yearly production: 3.899.000 kWh

Yearly savings in CO2: 1.937.000 kg



Providing electricity for:

Approx. 8.000 households

 

Contribution to the nature:

CO2 savings: 13.650 t/year