SHPP Grlja

Building start:

Under development
Location: Village Donje Vusanje, Municipality Gusinje
River: Grlja
Investor: ECG d.o.o. male hidroelektrane
General data:

Installed flow, Qinst.: 4,30 m³/s
Pipelinediameter: DN 1.600 mm
Length of the pipeline: 1.400 m
Turbines: 3 Francis turbines


Installed flow: 1.198 kW
Yearly production : 3.385.000 kWh

Yearly savings in CO2: 2.000.000 kg

Providing electricity for:

Approx. 8.000 households

 

Contribution to the nature:

CO2 savings: 26.000 t/year