SHPP Ljubanska 75

Building start:

Commissioning:

August 2011

December 2012

Location: Village Ljubanci, Municipality/City of Skopje
River: Ljubanska
Investor EMK d.o.o.e.l. mali hidroelektrani

Generald data:

Intalled flow, Qinst.: 0,17 m³/sec
Pipeline diameter: DN 400 mm
Length of the pipeline: 1.680 m
Turbine: 1 Pelton turbine


Installed capacity: 223 kW
Yearly production: 742.000 kWh

Yearly savings in CO2: 370.000 kg

Providing electricity for:

Approx. 8.000 households

 

Contribution to the nature:

CO2 savings: 13.650 t/year