SHPP Kriva Reka 179-1

Commissioning: January 2015
Location: Village Klečovce, Municipality Kriva Palanka
River: Kriva Reka
Investor: EMK d.o.o.e.l. mali hidroelektrani
General data:

Installed flow, Qinst.: 0,60 m³/sec
Pipeline diamter: DN 600 mm
Length of the pipeline: 1.780 m
Turbine: 1 Pelton turbine


Installed capacity: 544 kW
Yearly production: 2.068.000 kWh

Yearly savings in CO2: 1.220.000 kg



SHPP Kriva Reka 179-2/3

Building start: January 2015
Location: Village Kostur, Municipality Kriva Palanka
River: Kriva Reka
Investor: EMK d.o.o.e.l. mali hidroelektrani
General data:

Installed flow, Qinst.: 1,05 m³/sec
Piepilne diameter: DN 700 mm / DN 500 mm
Length of the pipeline: 1.255 m / 2.730


Turbines: 2 Pelton turbines
Installed power: 941 kW
Yearly prodution: 3.470.000 kWh

Yearly savings in CO2: 2.047.000 kg

Providing electricity for:

Approx. 8.000 households

 

Contribution to the nature:

CO2 savings: 26.000 t/year

Headquarters:

 

Energy Eastern Europe

Hydro Power GmbH

Thomas Klestil Platz 14

1030 Vienna

Austria

Contact:

 

Tel.: +43 (0) 1 4004 30240

 

Email: office@energy-eastern.eu

Office hours:

 

Monday - Friday

08:00 - 16:00

Druckversion Druckversion | Sitemap