SHPP Botašnica Ušće

Building start:

Commissioning:

September 2013

April 2016

Location: Village Botašnica, Municipality Zavidovići
River: Gostović
Investor: EBH d.o.o. male hidroelektrane
General data:

Installed flow, Qinst.: 1,85 m³/sec
Pipeline diameter: DN 1.200 mm /DN 1.000 mm
Length of the pipeline: 3.018 m
Turbines: 2 Francis turbines


Installed capacity: 921 kW
Yearly production: 3.775.000 kWh

Yearly savings in CO2: 2.227.000 kg



Providing electricity for:

Approx. 8.000 households

 

Contribution to the nature:

CO2 savings: 26.000 t/year

Headquarters:

 

Energy Eastern Europe

Hydro Power GmbH

Thomas Klestil Platz 14

1030 Vienna

Austria

Contact:

 

Tel.: +43 (0) 1 4004 30240

 

Email: office@energy-eastern.eu

Office hours:

 

Monday - Friday

08:00 - 16:00

Druckversion Druckversion | Sitemap
Copyright © 2013 Energy Eastern Europe Hydro Power GmbH