SHPP Čardak

Building start:

Commissioning:

May 2011

May 2013

Location: Village Čardak, Municipality Zavidovići
River: Gostović
Investor: EBH d.o.o. male hidroelektrane
General data:

Installed flow, Qinst.: 5,80 m³/sec
Pipeline diameter: DN 1.800 mm / DN 1.700 mm
Length of the pipeline: 1.025 m
Turbines: 3 Francis turbines


Installed capacity: 945 kW
Yearly production: 4.514.000 kWh

Yearly savings in CO2: 2.088.600 kg



Providing electricity for:

Approx. 8.000 households

 

Contribution to the nature:

CO2 savings: 26.000 t/year